# Coralfil 3-Year Operational Scale-Up Plan

**Document ID:** CF-DD-02-SCALEUP  
**Version:** v2.5 (Institutional Seed Valuation Edition)  
**Date:** October 15, 2026  
**Company:** Coralfil Inc. (Victoria, British Columbia, Canada)  
**Valuation Cap:** $8,000,000 CAD Standard ($7,500,000 CAD Early-Bird Cap)  
**Effective Entry Valuation:** $5,250,000 to $5,600,000 CAD (After 30% BC EBC Refund)  
**Target Seed Raise:** $1,500,000 CAD ($750k Tranche 1)  
**Punctuation Standard:** Zero em dashes strictly enforced.

---

## 1. Executive Scaling Thesis: Dual Track, One Unified Goal

Coralfil scales operations through a synchronized dual-track strategy. On the physical manufacturing side, we bypass conventional multi-million dollar brick-and-mortar capital expenditures by deploying modular, zero-pollute, 40-foot containerized processing units directly at deep-water coastal terminals. On the software side, our sovereign foundation models and graph memory architecture scale globally via low-latency API endpoints and self-serve SaaS subscriptions.

Both tracks converge on a single goal: establishing Coralfil as the sovereign operating system and sustainable biomaterials foundation for coastal marine ecosystems.

---

## 2. Three-Year Phased Milestone Roadmap

```
+----------------------------------------------------------------------------------------------------+
|                                    CORALFIL 3-YEAR SCALE-UP ROADMAP                                |
+----------------------------------------------------------------------------------------------------+
| PHASE 1: MONTHS 1-12 (FOUNDATION & REGIONAL PACIFIC NW BEACHHEAD)                                  |
| * Milestone 1.1: Close $1.5M CAD SAFE seed round with BC EBC 30% tax credit certificates issued.   |
| * Milestone 1.2: Disburse $485k CAD stacked grants (NRC IRAP, Innovate BC, Canada AICA).           |
| * Milestone 1.3: Commission Crusoe Cloud H100 cluster for continuous Atlantis foundation loops.   |
| * Milestone 1.4: Execute Cow Bay Terminal waterfront lease with deep-water barge slipway.          |
| * Milestone 1.5: Commission first 40ft containerized processing unit; process 350 tonnes shell.     |
| * Milestone 1.6: Commercial launch of Shell Flour ($420/t) and Coastal Crush ($280/t) in Q4 2026.  |
| * Milestone 1.7: Expand Coralfil OS to 1,800 active seats; achieve $140,200 MRR ($1.68M ARR).      |
|                                                                                                    |
| PHASE 2: MONTHS 13-24 (PACIFIC RIM COMMERCIAL EXPANSION)                                           |
| * Milestone 2.1: Fabricate and deploy two additional containerized biorefineries (total 3 units).  |
| * Milestone 2.2: Scale raw shell intake to 1,200 tonnes annually across Vancouver Island.          |
| * Milestone 2.3: Complete commercial port acoustic installations of NuriStone panels.              |
| * Milestone 2.4: Deploy Atlantis-Obelisk edge model across 10 commercial aquaculture vessels.       |
| * Milestone 2.5: Expand platform to 4,500 active seats; achieve $380,500 MRR ($4.56M ARR).         |
| * Milestone 2.6: Initiate Series A institutional growth round ($6M to $10M USD).                   |
|                                                                                                    |
| PHASE 3: MONTHS 25-36 (GLOBAL COASTAL LICENSING & PROFITABILITY)                                   |
| * Milestone 3.1: Export containerized biorefineries to Caribbean and California aquaculture hubs.  |
| * Milestone 3.2: Commercialize OceanSafe 3D printing filaments and biocalcifying reef decoys.      |
| * Milestone 3.3: Exceed 10,000 active enterprise software seats; surpass $852,000 MRR ($10.2M ARR).|
| * Milestone 3.4: Achieve sustainable net cashflow profitability without external capital dependency|
+----------------------------------------------------------------------------------------------------+
```

---

## 3. Operational Milestone Breakdown by Functional Domain

### Manufacturing & Logistics Scale-Up
- **Year 1 Target:** Process 350 tonnes of raw shell waste into commercial ag-grade flour and graded crush. Secure waterfront staging at Cow Bay Terminal to accept barge deliveries directly from Baynes Sound.
- **Year 2 Target:** Scale intake to 1,200 tonnes. Commission second containerized module for acoustic panel casting. Establish regional distribution hubs in Nanaimo and the Fraser Valley.
- **Year 3 Target:** Reach 2,500 tonnes annual throughput. Standardize turn-key modular container kits for international licensing to global shellfish cooperatives.

### Software, AI & Edge Infrastructure Scale-Up
- **Year 1 Target:** Serve Atlantis-Pyramid v2 via Crusoe Cloud and Lambda Labs GPU clusters. Integrate live ERDDAP and CIOOS telemetry streams into the Pacific Ocean Monitor.
- **Year 2 Target:** Quantize Atlantis-Obelisk using AWQ INT4 precision for deployment on low-cost onboard marine PCs. Expand AboveBoard statutory benchmark coverage to US federal NOAA fisheries laws.
- **Year 3 Target:** Automate multi-modal satellite SAR imagery analysis for illegal fishing and harmful algal bloom prediction across the Pacific Rim.

### Commercial Pipeline & Revenue Targets
- **Year 1 Target:** $1.68M CAD Annualized Run Rate (ARR) split between recurring software ($1.1M) and mineral products ($580k).
- **Year 2 Target:** $4.56M CAD ARR with 76% blended gross margins.
- **Year 3 Target:** $10.22M CAD ARR and positive net earnings before tax.

---

## 4. Funding Unlocks Linked to Operational Milestones

1. **Unlock Tranche 1 (Month 1):** SAFE close at $7.5M/$8.0M CAD cap unlocks NRC IRAP hiring subsidies and triggers industrial equipment acquisition.
2. **Unlock Tranche 2 (Month 6):** Commissioning of the first containerized plant triggers $80,000 CAD Ocean Supercluster commercial deployment grant.
3. **Unlock Tranche 3 (Month 12):** Achieving $140,200 MRR satisfies Series A milestone gates for Canadian and US climate-tech venture capital funds.